Shower Over Bath Installation in a New-Build Home
New hot and cold pipework, coordinated wall tiling, an exposed T-bar mixer shower and glass shower screen for a guest-friendly second shower.
Read the full case study →REAL WORK • EDINBURGH & SURROUNDING AREAS
Browse selected installations, investigations and repairs. See the problem, the work involved and the care taken on site.
New hot and cold pipework, coordinated wall tiling, an exposed T-bar mixer shower and glass shower screen for a guest-friendly second shower.
Read the full case study →Water dripping from the boiler was traced to the cold-water flow turbine and sensor assembly. Genuine manufacturer components were installed, followed by operational checks.
Read the full case study →A failed Vado digital shower was replaced with a Mira Platinum unit, including neat alterations to the existing copper pipework. Completed in under two hours.
Read the full case study →A routine boiler service identified a pressure drop. Further installation-pipework testing also indicated a pressure drop, so the gas was capped for safety.
Read the full case study →